The Reedy Creek Wallumbilla Pipeline (RCWP) is a transmission pipeline located in south-east Queensland. The APA Group owns and operates the transmission pipeline.
The RCWP is 50 km in length and has a bi-directional capacity of 300 TJ/day. The RCWP connects the APA Group’s Wallumbilla Gas Hub to the Australia Pacific LNG Pipeline at Reedy Creek.
The RCWP is currently a non-scheme pipeline, and is subject to the access regime for non-scheme pipelines under Chapter 6A of the NGL and Part 23 of the NGR. On 30 November 2022, the AER granted a 5 year category 2 exemption under Part 23 of the NGR for the Reedy Creek Wallumbilla Pipeline.
The RCWP became operational in June 2018.