QLD: Reedy Creek Wallumbilla Pipeline

QLD: Reedy Creek Wallumbilla Pipeline

The Reedy Creek Wallumbilla Pipeline (RCWP) is a transmission pipeline located in south-east Queensland. The APA Group owns and operates the transmission pipeline.
 
The RCWP is 50 km in length and has a bi-directional capacity of 300 TJ/day. The RCWP connects the APA Group’s Wallumbilla Gas Hub to the Australia Pacific LNG Pipeline at Reedy Creek.  
The RCWP is currently a non-scheme pipeline, and is subject to the access regime for non-scheme pipelines under Chapter 6A of the NGL and Part 23 of the NGR. On 30 November 2022, the AER granted a 5 year category 2 exemption under Part 23 of the NGR for the Reedy Creek Wallumbilla Pipeline. 

The RCWP became operational in June 2018. 

Pipeline details

State:

QLD

Type:

Transmission

Capacity:

300 TJ/day

Regulation:

Non-scheme

Additional Regulation:

Category 2

Owner:

APA Group

Operator:

APA Group

Length:

50 km

Contact us

Title Date Documents
AER letter to APA re Reedy Creek exemption application 2018-02-28 Part 23 decision
AER letter to APA re pipeline exemptions dated 30 November 2022_5 2022-11-30 Part 23 decision
Reedy Creek Pipeline map 2018-02-28 Pipeline description
Rotate phone landscape for better viewing