QLD: Braemar 2 Pipeline

QLD: Braemar 2 Pipeline

The Braemer 2 Pipeline is a 100 km high-pressure carbon steel gas transmission pipeline that delivers gas to the Braemar 2 Power Station from various points in the Surat Basin.

The pipeline was owned by Arrow Energy which was bought out in 2010 and is now jointly owned by Shell (50%) and Petro China (50%). The Braemer 2 Pipeline is currently a non-scheme pipeline and is subject to the access regime for non-scheme pipelines under Chapter 6 of the NGL and Part 23 of the NGR. On 25 May 2018,  the AER granted a 5-year exemption under Category 1 and 2 of Part 23 of the NGR. On 19 December 2022, the AER granted a further 5-year exemption under Category 1 of Part 24 of the NGR. 
 

Pipeline details

State:

QLD

Type:

Transmission

Capacity:

15TJ/day

Regulation:

Non-scheme

Additional Regulation:

Category 1 and 2

Owner:

Arrow (Southern Generation) Pty Ltd and Arrow Braemar 2 Pty Ltd TA NewGen Braemar 2 Partnership

Length:

100 km

Contact us

Pipeline owner's links

Title Date Documents
AER letter to Arrow re Braemar 2 Pipeline exemption application 2018-05-25 Part 23 Exemption
AER Letter to Arrow Energy re Braemar 2 Pipeline exemption application 2022-12-19 Part 23 Exemption